50 years

of trouble-free operation of the reconstructed pipe

4-5 hours

is the time of liner installation on the site

150 m/day

is a high laying speed

Preservation

of road surfaces, landscaped areas, natural landscape
Euro Tech Service provides a full range of specialized services for trenchless rehabilitation of pipeline utilities of various application and diameters in Europe.

Stages of work

Evaluation and planning

● Evaluation of a defective pipeline using teleinspection
● Measurement of the length, diameter and depth of the pipeline

Conclusion of a contract

● Conclusion of a contract for renovation work based on the results of the examination

Pre-starting procedures

● Hydrodynamic or mechanical pipeline cleaning
● Teleinspection of the old pipeline

Reconstruction

● Onsite delivery and drawing the liner into the defective pipeline
● Teleinspection of the pipeline and commissioning

The liner can be produced in such profiles as:

Egg-shaped profile
Circular profile
Frog-mouth profile
Box-profile